The homeowner punch list: what is left to fix before the final payment
Before the last installment, walk the job room by room and write down every item left to fix, with a photo, where it is and who fixes it. Hand the contractor the whole list at once. A list with photos gets fixed faster than ten scattered messages.
“[…] Pagamentos desaparecem e só aparecem depois de vencido. […]”
Our translation: “[…] Payments disappear and only show up after they are overdue. […]”Real review, 1 of 5 stars, Jul 2024, of another app: Obra Prima, App Store (Brasil)
That complaint is about payments that drop out of sight and only come back overdue. The end of a renovation is the mirror image: the last installment comes due, you pay it, and only then notice the stained grout behind the toilet. The payment and the list of what is left need to travel together.
How to do the walkthrough
- In daylight, then again with the lights on. Each one shows different flaws.
- One room at a time, clockwise, ceiling to floor.
- Test everything that opens, closes, switches on or drains: doors, drawers, windows, outlets, switches, faucets, drains, the flush.
- A photo of each item, close up and from a step back, so the contractor can find it.
What shows up most
- stained or missing grout;
- a crooked outlet or switch plate;
- paint drips on the floor, baseboard and window frames;
- a door that rubs, a drawer that will not close;
- a slow drain;
- missing caulk at the shower and the countertop.
How to hand it over
One list per contractor, with the photo, the room and a short line: "Stained grout behind the toilet. Hall bathroom." Agree on a date to fix it. Keep the tone of someone who wants to finish well: the list is not an accusation, it is the end of the job.
And the last installment?
The calmest way is to agree from the start that the last installment goes out once the list is done. If you did not, talk before you pay, list in hand. What counts between you is what you agreed.
Where Caderno da Obra comes in
The app has a "What's left to fix" list: each item with a photo, a room, a description and who fixes it, open or resolved. The list goes out as a PDF to send to the contractor. And when you are about to mark the last installment as paid for someone who still has open items, it tells you first, without stopping you.
Read next
- Fixed bid or day rate: how to set up contractor payments and know what is leftThe difference between a flat price and a day rate, how to tie contractor payments to finished stages, and a calculator for what is left to pay.
- A renovation diary for homeowners: what to record and how to keep it upA homeowner renovation diary is not a contractor daily log. What to record in two minutes a day: photos by room, what was agreed and what changed.
- How do I remember when each contractor payment is due?A missed installment means delay and bad feeling. How to build a contractor payment schedule for your renovation and get reminded on the day.