Fixed bid or day rate: how to set up contractor payments and know what is left
With a fixed bid, you agree on one price for the whole job, and the schedule risk sits with the contractor. With a day rate, you pay per day worked, and the schedule risk is yours. Either way, the same thing prevents the argument: what is included, the amount, the installments and the date, written down that day.
“Ele te ajuda na comunicação com seu time. Não tem mais desculpa de “eu esqueci “ nota 10”
Our translation: “It helps you communicate with your crew. No more "I forgot" excuse. 10 out of 10”Real review, 5 of 5 stars, Mar 2026, of another app: Obra Controle, App Store (Brasil)
"I forgot" is almost never bad faith. It is two adults remembering a ten-minute conversation differently, standing in the dust. What ends it is the agreement written the same day, seen by both.
Fixed bid (flat price)
One price for the job: "whole kitchen, demo, floor, walls and countertop, 12,000". Good when the work can be described clearly. What needs to be in writing:
- what is included, room by room;
- who buys the materials;
- what is left out (and becomes a change order if it comes up);
- the installments, each tied to a finished stage.
Day rate
A price per day worked. Good for work that is hard to measure up front, like demo and repairs. What needs to be in writing: the rate, what a half day is worth, and which day you settle up (every Friday, say). Mark the days on a calendar on the day itself. By the end of the month nobody remembers whether Tuesday was a full day.
How big should the deposit be?
We do not have an official number for you, and we will not make one up; rules and customs vary by place. What works is the logic: payment follows the work. Smaller installments, tied to stages you can see finished (demo done, floor laid, grout and cleanup), keep both sides relaxed. And the last installment goes out after you have checked the punch list.
The math for what is left
Fixed bid: the amount agreed, plus change orders, minus what you have paid. Day rate: days worked times the rate, plus change orders, minus what you have paid. Run it here:
Nothing is saved or sent. The math runs in your browser. The currency symbol is just for show: type your own numbers.
Read next
- "That's extra": how to agree on and log a change order without a fightChange orders are the top source of arguments and budget overruns in a renovation. A four-item rule to settle one before the work starts.
- How do I remember when each contractor payment is due?A missed installment means delay and bad feeling. How to build a contractor payment schedule for your renovation and get reminded on the day.
- My contractor says he forgot what we agreed. What do I do?When a contractor says he forgot the agreement, it is rarely bad faith. How to settle it now and stop depending on anyone's memory.